Non-Conformity Cell Quality Technician 1

Datum: 14.06.2024

Standort: Wien, AT

Unternehmen: Alstom

Req ID:457978 

 

Wir bei Alstom verstehen Verkehrsnetze und was Menschen bewegt. Von Hochgeschwindigkeitszügen, U-Bahnen, Monorails und Straßenbahnen bis hin zu schlüsselfertigen Systemen, Dienstleistungen, Infrastruktur, Signaltechnik und digitaler Mobilität bieten wir unseren Kunden das branchenweit breiteste Portfolio an Möglichkeiten. Unsere 80.000 Kolleginnen und Kollegen machen Mobilität auf der ganzen Welt jeden Tag noch umweltfreundlicher und intelligenter, indem sie Städte miteinander verbinden und dazu beitragen, dass der CO2-Ausstoß reduziert und Autos ersetzt werden.

 

 

Tasks

§ Characterize the defect on purchased parts (5W2H) and write the relevent reports (NCR : Non conformity reports) with the

objective to limit production disturbances.

§ Secure the production line ensuring that no other defective part is available with a clear mapping (physical identification and

parts in restricted area)

§ Organize the re-feeding to the line with new conform parts within the takt-time of the line (if part is available in stocks)

§ Organize the first level of containment with management of control and sorting activities (internal, and coordination for

supplier)

§ Block (or ask to block) stock for non-conform parts

§ Ask for new control key in ERP for incoming inspection for upcoming deliveries and provide inspection criteria

§ Create Non-conformity reports in ERP and SQP (Supplier Quality Portal)

§ Notify NCr to supplier via Supplier Quality Portal tool (NCR module) for NCr with supplier or expertise liability

§ Manage relevant supplier rework activities

§ Participate to daily and weekly meetings with various stakeholders

§ Relevent Quality KPI of NCr cell :

o Number of opened and closed non -conformities

o Re-feeding lead time (time between declaration of defect and availability of replacement part on the line)

o Status of containment (WIP and warehouse)

o Leadtime of notification to suppliers

o Leadtime of supplier Containment

o Blocked stock value

o % of NCR liability change

o Number of non-conformities under expertise

o Average time spent in restricted area

o Overall non-conformity process time

§ For SC-NC-01_002, manage a small team of NC Cell Quality technicians

 

EHS :

§ Ensure the application of safety guidelines and proper use of manufacturing equipment

§ Enforce the application of prevention plans

§ Take all required actions when confronted with any hazard

 

 

 

Bei Alstom finden übrigens nicht nur Zugenthusiasten einen erfüllenden Wirkungsbereich. Wir können Ihnen garantieren, dass Sie stolz sein werden, wenn Sie mit Freunden oder Familie in einen unserer Züge steigen. Sie fühlen sich der Herausforderung gewachsen? Dann würden wir uns freuen, von Ihnen zu hören!

 

Was Sie sonst noch wissen sollten

Als weltweit tätiges Unternehmen sind wir ein Arbeitgeber, der Chancengleichheit fördert und die Vielfalt in den über 63 Ländern, in denen wir tätig sind, würdigt. Wir setzen uns dafür ein, allen einen integrativen Arbeitsplatz bieten zu können.